Provisional Energy Supply To The Compact Stations Of The Aeration Tanks. To Ensure The Energy Supply And Data Communication Between The Aeration Tanks (Compact Stations) And The Blower Hall 1, A Temporary Solution Must Be Installed Before Construction Of The Elevated Cable Route Begins. The Temporary Solution Is Necessary To Enable The Route To Be Built For The Construction Of The New Elevated Route. In Order To Clear The Construction Site For The Construction Of The Cable Elevated Route East For The Extension Of The Ms Ring, Cables Located In The Construction Site Must Be Replaced In Advance With Temporary Solutions. The Old Cables Must Then Be Dismantled. The Following Cables Are Affected By The Measure: Energy Supply For The Switchgear Of The Compact Stations: Aeration Tank (Bb) 25-27, Aeration Tank (Bb) 28-30 And Aeration Tank (Bb) 31-33 As Well As Various Fiber Optic Cables And Msr -Cables For Transmitting Signaling And Control Signals And Ups Cables. The Energy Cables And Ups Cables Are Currently Connected In The Lv Room Of Transformer Station 6 In Blower Hall 1. The Old Multi-Conductor Cables Run From The Lv Room Of Transformer Station 6 Through A Partitioned Floor Opening Into The Basement Of The Blower Hall Building. Further Laying Takes Place On Cable Trays Within The Blower Hall Building. In Addition To The Energy Cables, There Are Various Msr Cables (Lwl And A2y(L)2Y) In The Construction Area. Analogous To The Energy Cables, The Msr Cables Must Be Replaced With Temporary Ones And Then Dismantled .
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.