Tenders Are Invited For Execution In The Design And Build Mode Of The Investment Task Entitled: : : Expansion Of The M. Konopnicka Primary School In Konin
Tenders Are Invited For Execution In The Design And Build Mode Of The Investment Task Entitled: : : Expansion Of The M. Konopnicka Primary School In Konin
1. The Subject Of The Order Is The Development Of Full-Sector Design And Cost Estimate Documentation And The Execution Of Construction Works In The Design And Build Formula, On The Basis Of Which It Will Be Possible To Carry Out Construction Both In Formal, Legal And Technical Terms, And To Perform Works In Accordance With This Documentation Of The Investment Task Entitled .: Expansion Of The Primary School Maria Konopnicka In Konin. 2. Characteristic Parameters Defining The Size Of The Project. Designed Building: Net Area: 735.04 M2 5% - Ground Floor: 696.04 M2 - First Floor: 39.00 M2 Building Area: 794.04 M2 5% Number Of Above-Ground Floors: 2 Maximum Height Of The Building (Max. . Height Of Local Development Plan: 18M): 11.74 M 5% (Max. 12.00) Gross Volume: 5,847.86M3 5% Roof: Single-Pitch 2-5 (Lower Part), Gable 30 ( Higher Part) 3. The Scope Of The Order Includes In Particular: 3.1 Development Of Design Documentation Consisting Of: A Multi-Discipline Concept; Obtaining A Map For Design Purposes; Construction Design Along With The Necessary Decisions, Opinions And Arrangements And Obtaining A Final Building Permit Decision; Technical Design; Detailed Design [Scope And Form In Accordance With The Regulation Of The Minister Of Development And Technology Of December 20, 2021 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional And Utility Program (Journal Of Laws> Of 2021, Item 2454)]; Development Of Complete Technical Specifications For The Execution And Acceptance Of Works Extending The Scope Of Specifications Contained In This Study, Performed Before Construction Works; Preparation Of Bills Of Quantities And Investor Cost Estimates; Preparation Of An Energy Performance Certificate And Performance; Preparation Of As-Built Documentation; Development Of A Basic Interior Design Project; Development Of The Fire Safety Instruction (Providing Buildings With Fire Protection Equipment And Markings. In Accordance With This Instruction Is The Responsibility Of The Contractor); And: Ensuring Full Surveying Services For The Investment; Obtaining A Valid Decision On A Building Permit; Performing Authors Supervision; Necessary Decisions, Notifications, Opinions And Arrangements; All Unmentioned Studies Necessary To Complete The Subject Of The Order; Obtaining An Occupancy Permit. 3.2 Execution Of Construction Works: Execution Of Construction Works; Execution Of Finishing Works; Execution Of External Installations; Execution Of Connections; Execution Of Sanitary Installations; Execution Of Mechanical Ventilation Installation; Execution Of Lightning Protection Installation; Execution Of Electrical And Telecommunications Installations; Execution Of Installation Photovoltaic Panels On The Roof; Delivery And Assembly Of Furniture And Sports Equipment; Execution Of Earthworks, Road Works And Finishing Of Green Areas, All Other Works Necessary To Complete The Subject Of The Order.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.