Lot1: Mechanical Engineering, Piping And Locksmith Work Lot2: Earth & Concrete Construction Work Lot3: Electrical Workthe Niersverband Is Building A New Biofilter At The M nchengladbach-Neuwerk Sewage Treatment Plant For Suction From The Area Of The Future New And Existing Sludge Drainage. The Extraction Is Partly Carried Out From Potentially Explosive Atmospheres (Ex Zone 1). The Structural Measures, The Mechanical Equipment Including The Measurement Technology And The Electrical Engineering Will Be Awarded In Separate Lots. The Following Measures Are Planned: Clear The Construction Site And Excavate Around 1M Deep Across The Entire Area. Erection Of The Concrete Structures And Foundations. Laying Of Cable Pipes, Earth Strips And Underground Pipelines. Filling And Compacting The Area As Well As Creating Paths And Lawns. Erecting The Pipe Supports And The Pipes Attached To Them. Setting Up And Connecting The Machine Technology And Measurement Technology (2 Fans, Humidifier, Biofilter). The General Power Supply Is Provided Via A Newly Laid Feed Cable. The Switchgear For All System Components Is Installed As An External Switch Cabinet Next To The System Technology. A Fiber Optic Cable Is Required For The Connection To The Higher-Level Pls; Additional Cables Must Be Laid For The Measurement Technology.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.