Well-Plugging Services - Blocking Of Deep Drillings For Mining Purposes In 2024. A Detailed Description Of The Tasks Can Be Found In The Tender Documentation. It Cannot Be Used Safeguarding Of 4 Disused Mining Deep Wells (Hydrocarbon Wells), Closure In Accordance With The Liquidation Plans That Are Part Of The Public Procurement Documentation, With The Well Repair Equipment And Personnel Specified In The Technical Documentation. Provision Of Well Work Fluids From The Well Necessary To Carry Out Well Work Disposal Of Flushed Liquids, Hazardous Waste, Scrap Metal. The Well Work Placement Of A Total Of 8 Cement Plugs For The 4 Wells, 3 Sectioning Operation And Placement Of 1 Liner Pipe Plug. During The Construction Of The Wells In All 4 Deep Boreholes, Gas-Bearing Layers Were Intersected. To Place The Well Repair Equipment Preparation And Reinforcement Of Access Routes, For The Placement Of Well Repair Equipment Supplementing The Funds. After The Operations Are Completed, Access Roads And Foundations Restoring The Natural Environment To Its Original State. Quantitative Difference: An Additional Maximum Of 1 Non-Usable, Unused Deep Drilling For Mining Purposes (Hydrocarbon Well) In The Public Procurement Documentation In Accordance With The Included Liquidation Plans, Defined In The Technical Documentation According To A Maximum Of 1 In Total For A Maximum Of 1 Well During Well Work Placement Of Cement Plug, 1 Sectioning, Placement Of 1 Liner Pipe Plug.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.