Tenders Are Invited For Works For Complete Or Part Construction And Civil Engineering Work - Pilisborosjen -Budapest Common Sewage System

Tender Detail

73796383
752867-2023
Self-Funded
Tenders Are Invited For Works For Complete Or Part Construction And Civil Engineering Work - Pilisborosjen -Budapest Common Sewage System
ICB
Central Europe
European Union
19-01-2024

Work Detail

Works For Complete Or Part Construction And Civil Engineering Work - Pilisborosjen -Budapest Common Sewage System. In The Framework Of A Business Contract, The Joint Sewerage Of Pilisborosjen And Budapest Capital City Project C. Complete Provision Of Project Planning And Implementation Tasks According To The Terms Of The Fidic Yellow Book. The Implementation Is Mainly Indicative (Informative Nature) Quantities Are The Following, In Connection With Which The License And Execution Plans Preparation Is Also Required: Main Data Of The Planned Sewage Network: Planned Number Of Sewage Connections: Pilisborosjen : 47 Domestic Intake Units In The Planning Area: 21 Pcs. Gravity Backbone Line Pilisborojen D200 Kg-Pvc 902 Fm r m D200 Kg-Pvc 1005 Fm r m D315 Kg-Pvc 1135 Fm Total: 3042 Fm B. Pressure Line Pilisborosjen D160 (Kpe Pn 10, Pe100, Sdr 17) 1207 Fm r m D315 (Kpe Pn 10, Pe100, Sdr 17) 270 Fm Total: 1477 Fm Planned Hoist: 1 Hoist To Be Renovated: 2 Designed For Hoist Number Of Drinking Water Connections, Water Clock Manholes: 1 Chemical Dispenser For The Newly Built Lift Equipment Should Be Installed To Prevent Sewage Rot Expected On Long Transmission Line Sections In Order To Prevent Processes. Active Biofilter To Eliminate The Odor Effect To Be Built Next To The Hoist. In Addition, Its Task Is To Expand The P k Utca Lifting Plant, As Follows: The Planned Artefact With A Separated Intake Area Instead Of Elevations The Existing Riser Would Be Installed In A Pump Shaft With A Built-Up Dry Area On The N Side Of The Building, At Almost The Same Depth. The Existing N And D Suction Areas, As Well As The Planned Lifting Structure With The Construction Of A Dn1000 Suction Pipe Are Connected By Providing The Option Of Splitting. The Planned 3 Operating Units And 1 Backup Pump Pressure Line With A Collector Pipe Inside The Shaft Will Be Combined And Connected To The Oszt akna With A Dn800 Underground Pipeline And The Existing Dn800 Pipe Between The Water Quantity Measuring Shaft, Which Is Located In The North It Provides Drainage To The Wastewater Treatment Plant In Pest. The P k Street Lift Plant Capacity Expansion, Even For The North-Pest Wastewater Treatment Plant (Independent Of The Danube Water Level) Water Transport Capacity Is Provided By A New, Existing One A Dry Shaft With A Separated Suction Area Installed Next To A Lifting Structure We Provide It With A Lift Equipped With Pumps. According To The Operators Request, The Dry Mine 3+1 Pumps Will Be Installed In The Mechanical Space. The Built-In 3 1 Operational And 1 Spare Horizontal Axis Pumps For Expansion On Request Max. Q=1000 L/S (3600 M3/Hour) Waste Water Volume North Pest Wastewater Treatment Was Designed For Transmission To The Plant. Machine Units Are Switched On And Off Frequently To Avoid This, The Speed Of The Pumps Is Controlled And Can Be Harmonized In This Way The Capacity Of The Sewage Treatment Plant For The Amount Of Water On The Receiving Side. Winning Bidder Is Responsible For The Technical Content That Is Part Of The Public Documents, The Water Law Eng. And Take Out. Preparation Of Plans According To 191/2009.(Ix.15.)Kr. With Appropriate Content. Winner At Bears Full Responsibility For The Contents Of The Documents And Plans Prepared By It For Its Correctness And Those Contained In The Relevant Standards, Legislation And Other Regulations For Compliance. Ak Draws Attention To The Fact That The Ser.Tel. During The Fidic Yellow The Provisions Of This Book Apply. 266/2013 Is Required During The Performance Of The Contract. (Vii.11.) Government Order The Involvement Of A Specialist With Vz-Ter Authorization According To The Bidder Shall Attach A Statement In His Bid That On The Date Of The Conclusion Of The Contract 266/2013 Will Provide For The Duration Of The Contract. (Vii.11.) Govt. With Specialist(S) With Vz-Ter Authorization According To 321/2015. (X.30.) Government Decree (Further On In Public Procurement Documents: Cr.) 46. (3) In View Of The Provisions Of Paragraph If A Clear And Comprehensible Definition Of The Subject Of The Public Procurement Is Necessary Made To A Specific Make, Origin, Type Of Thing, Procedure, Activity, Reference To A Person, Patent Or Trademark, The Designation Is Only The Subject It Was Done In Order To Clearly Define Its Nature, And In Addition To The Name, Or Equivalent Is Understood In All Cases. The Tenderer Draws Attention To The Fact That In Case Of Offering An Equivalent Thing, The Equivalence In The Offer Of The Offeror You Must Verify. In Detail: Kd.

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail