Part I: Construction Of A Water Treatment Plant In Dziedzice (Mode: Design And Build) The Subject Of The Contract Is The Development Of Full Technical And Cost Construction Documentation And The Comprehensive Construction Of A Water Treatment Plant With The Necessary Accompanying Infrastructure. The Task Will Be Implemented In The Design And Build Mode And Includes The Following Scope Of Work: 1. Development Of The Already Made Wells No. 1, 2. Drilling And Development Of The Deep Well No. 2 With A Depth Of Up To 100 M According To 3. Construction Of A One-Story Brick Building - A Water Treatment Plant Without A Basement (Clinker Brick Façade), Consisting Of The Following Rooms: Social Area, Server Room, Technology Hall, Power Generator Room, Workshop, Vestibule, 4. Design Technology And Installation Of Equipment For Water Treatment And Pumping (Including Delivery And Assembly), 5. Purchase And Delivery Of A Power Generator Ensuring Operation Of The Entire Station In Periods Without Constant Voltage, 6. Construction Of A Treated Water Tank With A Capacity Of Approx. 500 M3 ( Selection Of Reservoir Parameters Preceded By An Analysis Of The Water Demand Of Residents Served By The Water Treatment Plant And Well Efficiency), 7. Construction Of An Independent, Publicly Accessible Draw-Off Point (Above-Ground Hydrant) Ensuring Fire Protection Of Nearby Forests - The Location Should Be Agreed With The Employer, 8. Reconstruction Of The Access Road To The Station (Road Plots - D.E Village No. 244 Ob. Smolarnia, Plot Plot No. 250/3 Ob. Racławiczki, Plot Of Record No. 98 Ob. Dziedzice); 8 Cm, 10. Drainage Of Sealed Surfaces, Including Traffic Areas, Together With The Design And Implementation Of The Management Of These Waters, 11. Making A Power Connection To The Plot And Infrastructure In The Suw, 12. Execution Of External Lighting Of The Entire Station, 13. Construction Of A Septic Tank And Washings Tank, 14. Construction Of A Wooden, Roofed Carport, Dimensions Min. 3 X 5 M, 15. Construction Of A Fence For The Entire Area Of The Suw, 16. Connection To The Existing Water Supply Network, 17. Monitoring And Visualization Of The Operation Of The Suw (Scada) To The Existing System Owned By The Employer, 18. Installation Of A Photovoltaic Installation Providing Energy For The Entire Station. The Power Of The Installation Will Be Determined And Calculated Based On The Calculation Of The Energy Demand Of All Devices. 19. Purchase, Delivery And Installation Of A Water Packaging Machine. The Planned Groundwater Intake And Water Treatment Plant Will Be Located In Dziedzice On Plot No. 37/3.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.