Site Formation And Infrastructure Works For Yuen Long South First Phase Development Contract 1 1 Site Clearance And Formation Including Land Decontamination Works For About Five Hectares Of Land Together With The Provision Of Associated Engineering Infrastructure 2 Construction Of A Single Two Lane Carriageway Of About 130 Metres Long Connecting To Lam Tai West Road 3 Construction Of A Single Two Lane Carriageway Of About 130 Metres Long Connecting To Long Hon Road 4 Construction Of Associated Works Including Footpaths Slopes Retaining Wall Landscaping Works Water Supply System Sewerage System And Drainage System And 5 Implementation Of Environmental Mitigation Measures For The Works Mentioned Above The Works Are Scheduled To Commence In September 2022 And Will Take About 32 Months To Complete
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.